This Washington Metropolitan Area Transit Authority (WMATA) project includes the removal, upgrade and/or installation of underground storage tanks (USTs) (gasoline, diesel), above ground storage tank (AST) at the Alexandria Rail Yard facility in Alexandria, VA.
D2 is currently performing site work services to include sediment and erosion control, demolition, and excavation (shoring).